Second-Level Bathroom Remodel
- Home |
- Second-Level Bathroom Remodel
Project Overview
Date :
September 10, 2024
Category :
Residential – Full Bathroom Renovation
Location :
Washington, DC
Second-Level Bathroom Remodel
Scope:
Full demolition of shower wall and tub area
Installed new vanity, double sink, bathtub, shower system, and toilet
Upgraded flooring and refinished bathroom walls
Painted ceiling, walls, and door
Installed new lighting for improved functionality and ambiance
Short Description/Story:
This second-level bathroom remodel brought a dated space back to life with fresh fixtures, custom tilework, and modern finishes. CMR managed the entire project from demolition to final paint ensuring both form and function met the client’s vision.
Special Features:
Double sink vanity, full system plumbing update, custom shower wall
Client Quote:
“CMR delivered exactly what we envisioned clean lines, modern fixtures, and top-quality work. The space feels completely transformed.”
Before
After Photos